| 13,000Lt Hydro Excavation Unit |
|
| Includes: |
|
| |
|
|
6mm barrel and torrespherical ends from 250 grade mild steel with a diameter 1830mm. |
|
|
4 x 125mm x 75 external imploding rings. |
|
Full roll over protection fitted to top of tank with 38mm external drains on either side at end of tank. |
|
Two lifting lugs mounted on top of tank. |
|
Full length chassis rail on tank to be fabricated from 8mm steel. |
|
75SHS to be fabricated for base frame mounted to chassis and safety prop. |
|
Pivoting tank hinged from rear with a four stage hydraulic tipping ram. |
|
Full hydraulic opening rear door with twist lock securing system in two stages. |
|
|
6" air operated knife valve for out let and 4" knife valve for inlet with stand pipe wear plate. |
|
|
50mm EPA sample point and 3 sight glasses 1/2, 3/4 & near full on rear hatch. |
|
One low profile 75mm primary shut off capable 500cfm and one 450mm manway on top of tank. |
|
One front mounted secondary shut off with 100mm sight glass, pressure and vacuum relief valve, drain and 100mm liquid. |
|
Filled gauge. |
|
Air operated handrail system engaged by switch at base of access ladder. |
|
Two aluminium hose trays with checker plate trim and a front mounted tool box. |
|
|
Front mounted 2000ltr fresh water tank to supply pressure unit. |
|
|
Stationary mounted 3600psi pressure wash unit with 15mtrs of 5/16'' pressure hose on a manual retractable reel. |
|
550cfm liquid ring pompetravaini pump driven by PTO. |
|
Instrument panel and operating system cabinet will be mounted on left hand side of unit. |
|
Flashing beacon, two rear facing work lights and a work light for control cabinet. |
|
Sandblasting of all fabricate items and painted in two pack white. |
|
Chassis extension to suit tank. |
| |
|
|
| |
|